{"id":1988,"date":"2022-06-19T21:19:22","date_gmt":"2022-06-19T21:19:22","guid":{"rendered":"http:\/\/elradwancompany.com\/?post_type=portfolio&#038;p=1988"},"modified":"2022-06-19T21:19:22","modified_gmt":"2022-06-19T21:19:22","slug":"contract-no-153-14-2001-2002-complementary-contract-2-for-drilling-and-laying-works-of-pvc-plastic-pipes-with-a-length-of-12-5-km-in-the-marina-area","status":"publish","type":"portfolio","link":"https:\/\/www.elradwancompany.com\/en\/portfolio\/contract-no-153-14-2001-2002-complementary-contract-2-for-drilling-and-laying-works-of-pvc-plastic-pipes-with-a-length-of-12-5-km-in-the-marina-area\/","title":{"rendered":"Contract No. 153\/14\/2001\/2002 complementary contract (2) for drilling and laying works of PVC plastic pipes with a length of 12.5 km in the marina area"},"excerpt":{"rendered":"<p>Previous work of the armed forces<\/p>\n","protected":false},"featured_media":1577,"template":"","section":[45],"class_list":["post-1988","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","section-previous-work-of-the-armed-forces"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.elradwancompany.com\/en\/wp-json\/wp\/v2\/portfolio\/1988","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.elradwancompany.com\/en\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/www.elradwancompany.com\/en\/wp-json\/wp\/v2\/types\/portfolio"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.elradwancompany.com\/en\/wp-json\/wp\/v2\/media\/1577"}],"wp:attachment":[{"href":"https:\/\/www.elradwancompany.com\/en\/wp-json\/wp\/v2\/media?parent=1988"}],"wp:term":[{"taxonomy":"section","embeddable":true,"href":"https:\/\/www.elradwancompany.com\/en\/wp-json\/wp\/v2\/section?post=1988"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}